Project Challenge
Before automation, the company faced several operational bottlenecks:
- Low storage density and limited space utilization.
- Inefficient inbound and outbound processes, which could not keep up with growing business demands.
- High labor costs and intensive manual workload, leading to low productivity and safety risks.
NovaX Automation Solution
NovaX Automation provided a customized XCube solution tailored to the company’s operational needs.
- System Configuration: 60 XCube robots, 11 lifts, and 45 charging stations.
- Warehouse Specs: 27-meter height with 9 storage levels, pallet size 1280 × 1080 mm.
- Intelligent Control: Integrated with WMS/WCS systems for fully automated scheduling and real-time inventory management.

Project Results
The project achieved significant operational improvements:
- Storage capacity increased to 44,129 pallet positions, a 300% improvement over the original warehouse.
- Simultaneous inbound and outbound operations with throughput of 140 pallets/hour inbound and 170 pallets/hour outbound, meeting business demands of over 5,000 pallets/day during peak seasons.
- Improved efficiency, reduced labor dependency, and optimized warehouse space utilization.
Contact Us
NovaX Automation
Contact NovaX Automation experts and learn how we can optimize the pallet storage density and enable a higher efficiency.
info@novaxautomation.com
